Back to globe menu04 / DRAWING REVIEW

A second check before your drawings issue.

Technical review of single-line diagrams, three-line diagrams, schematics and interconnections. Findings identify the sheet, detail and significance, with response and closeout status recorded.

SLD

Single-line diagrams

Review distribution topology, equipment and protection ratings, source and feeder relationships, and grounding arrangements against the supplied design basis and reference information.

3LD

Three-line diagrams

Review phase connections, CT/VT ratios and polarity as shown, metering and protection circuit connections, and consistency with the single-line diagrams and supplied device information.

CTRL

Schematics

Review control logic, permissives, interlocks, trip and reset paths, and the indicated loss-of-power or fail-state behavior against the agreed operating sequence.

I/O

Interconnections and wiring

Cross-check cable tags, core and terminal assignments, I/O references and end-to-end connection consistency across the supplied drawings, schedules and vendor information.

Removal and new-work interfaces can be reviewed within the agreed scope: retained equipment, revised connections and continuity between the existing and proposed drawing sets.

What a finding looks like.

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 Fictional interconnection and cable-schedule discrepancy Interconnection diagram GG-DEMO-IC-002 revision A detail B2 lands cable C-DEMO-07 core 1 from CP-DEMO-01 terminal TB2:07 on CP-DEMO-02 terminal TB1:13. Cable and termination schedule GG-DEMO-CS-002 revision A row 7 instead lists destination TB1:14, a terminal the diagram shows as spare. The sources conflict; the intended destination requires confirmation. Review comment GG-R-001. INTERCONNECTION DIAGRAM - EXCERPT GG-DEMO-IC-002 / REV A / DETAIL B2 CP-DEMO-01 CONTROL PANEL CP-DEMO-02 CONTROL PANEL PLC-01 SLOT 3 DO 1 DO-0 START 2 DO-1 STOP 3 DO-2 RESET 4 DO-3 SPARE 24 VDC SOURCING TB2 05 06 07 08 305 306 307 TB1 11 12 13 14 411 412 413 RLY-201 INPUT RELAYS A1 K1 START A1 K2 STOP A1 K3 RESET A1 K4 SPARE 24 VDC COILS 3 3 4 4 1 1 2 SPARE 2 SPARE C-DEMO-07 4C #14 AWG TECK90 EXCERPT ONLY / NOT TO SCALE GG-R-001CORE 1 LANDS ON TB1:13 HERE.SCHEDULE ROW 7 SAYS TB1:14. CABLE AND TERMINATION SCHEDULE - EXCERPT GG-DEMO-CS-002 / REV A / ROWS 6-8 ROW CABLE NO. CORE CABLE TYPE NOTES FROM TO EQUIPMENT TERMINAL EQUIPMENT TERMINAL 6 C-DEMO-06 4 CP-DEMO-01 TB2:04 CP-DEMO-02 TB1:10 4C #14 AWG TECK90 - 7 C-DEMO-07 1 CP-DEMO-01 TB2:07 CP-DEMO-02 TB1:14 4C #14 AWG TECK90 - 8 C-DEMO-07 2 CP-DEMO-01 SPARE CP-DEMO-02 SPARE 4C #14 AWG TECK90 COILED AND TAPED, BOTH ENDS GG-R-001TB1:14 HERE. DIAGRAM SHOWS TB1:13. FICTIONAL EXCERPTS / FOR ILLUSTRATION ONLY / NOT A CLIENT PROJECT
GG-R-001OPEN

Confirm the destination terminal.

The interconnection shows TB1:13; the supplied schedule shows TB1:14 for the same cable and core.

Priority
Clarification required before the affected connection is released.
Recommended action
The responsible design team confirms the intended destination against the approved terminal plan, then aligns both documents.
Closeout
Check the agreed response and revised affected entries. Keep the comment open until the references agree.

The review flags the conflict; your design team decides which terminal is right. Closing a comment does not authorize construction or use.

What you receive

  • Marked-up review PDFs
  • Prioritized comment log with drawing and detail references
  • Cross-drawing discrepancy register
  • Comment response and closeout status

Each finding identifies the drawing or detail, the observed issue, its significance and the recommended action. Missing evidence is recorded as a query or review limitation.

1 initial technical review + 1 comment closeout pass

We review the agreed drawing register once, then make one closeout pass on our original comments using your consolidated responses and revised affected sheets. Closeout checks those comments; it is not a full fresh review of every revised sheet.

Review-only or drafting + review: quoted separately once we have seen the drawing register, complexity, review depth and reference documents. The drafting package prices do not include this review.

Agree the review basis

Agree the drawing register and revisions, review stage, design basis, applicable project standards, operating sequences, available calculations and vendor references before the review. The report records the checked scope and reference gaps.

Changes and additional review passes

Added drawings, a changed design basis, newly introduced changes outside the original findings, additional closeout cycles or a full review of a later revision are scoped and quoted separately before work proceeds.

Drafting and review in one assignment

Drafting and technical review can be quoted together with separate deliverables and allowances. The quote identifies who prepares and who reviews the work; a separate-person or independent check is included only when explicitly agreed and resourced. CAD implementation of review comments must be included in the drafting scope or quoted separately.

Findings, design decisions and final release

Technical review provides engineering findings and recommendations on the supplied information. It does not include producing new designs or calculation studies, field verification, certification, signing or sealing. The responsible project team decides the design response and authorizes final issue; a closed comment is not construction or use approval.

Request a quote

Start with a short outline. Drawing counts and timing can follow. You’ll get an email draft to review and send from your own email app.

  1. 01 Outline the work
  2. 02 Review your draft
  3. 03 Send from your email

Fields marked * are required.

We will help match the scope to a package after input review.

Choose the task that best describes your work, or ask us to help define it.

Keep this first outline non-confidential. No files are uploaded here.

0 / 1,200

Add drawing counts, stages or a deadline (optional)

Add what you know; leave the rest blank. These details help us assess the scope before quoting.

Drafting quantities (optional)

Count distinct sheets once. A separate removal sheet and new-work sheet count as two. Put a combined sheet in its main category; leave unknown counts blank.

Drawing mix not yet specified.

Count each distinct sheet once. This review register is scoped separately from the drafting quantities, even if the same sheets need both services.

A request, not a confirmed commitment.

Preparing a draft does not send it. Review it, then send from your email app. Scope, fees and dates are agreed before work starts.

Source markups / GG-DEMO-001

Fictional example. Not a native DWG or engineering drawing.

Privacy and site notes

Service terms in brief